SOIL SAMPLING PROJECT, XINWU DISTRICT, WUXI


QY-100LPRO

The QY-100L PRO rig was applied to the soil sampling project in Xinwu District, Wuxi, adopting direct-push soil sampling and monitoring well construction with helical casing. Equipped with soil sampling and monitoring well auger tools, it handled the concrete ground surface and plain soil strata; 6 m sampling took only 15–20 minutes and monitoring well installation took 25 minutes.

SOIL SAMPLING PROJECT, XINWU DISTRICT, WUXI

PROJECT CONFIGURATION


TOOL CONFIGURATION

  • 1 set of soil sampling tool (3.5 in, 6 m)
  • 1 set of monitoring well auger tool (4.25 in, 6 m)

PROCESS TYPE

  • Direct-push soil sampling
  • Monitoring well construction with helical casing

GROUND CONDITIONS

  • 0–0.2 m: concrete ground surface
  • 0.2–6 m: plain soil

CONSTRUCTION EFFICIENCY

  • 6 m soil sampling in 15–20 min
  • 6 m groundwater monitoring well installation in 25 min

VIEW OTHER SOLUTIONS

AFTER-SALE SERVICE

PROFESSIONAL SERVICE TEAM

XITEC Technology maintains a dedicated professional maintenance team and has established specialized overseas service centers for environmental drilling rigs. We are capable of servicing 99% of jet grouting, anchoring, and environmental drilling rigs available on the market. Upholding our commitment to protecting customer interests, we provide honest and reliable service, aiming for total customer satisfaction and ensuring every repair is completed to the highest standard.

CORE MAINTENANCE SERVICES

Our full-scope drilling rig maintenance covers all brands, including routine servicing, undercarriage repairs (track shoes, final drives, tensioning systems), rotary head overhauls (spindle parts replacement, hydraulic accumulator nitrogen charging), electronic & hydraulic system repairs, plus wear parts and consumables replacement.

WHEREVER THERE IS ENGINEERING IN THE WORLD
THERE IS INTELLIGENT EQUIPMENT OF XITEC.

Contact Us